INSTALLATION OF YOUR PARK
MODEL
Top questions about installation.
1. Does the Park Model need to be placed on a
foundation?
Not necessarily, although we have run into a County
that requires a foundation.
2. How is it leveled?
The factory strongly recommends placing metal piers or jacks
every 2-3 feet down each I-beam. We have found
using metal piers are much easier to fine tune leveling than
the cement piers. Plan on at least 5 down each side.
For your safety as well as protection of your Park
Model you should have a professional installer level the
unit.
3. Do the axles remain on or are they removed?
It's up to you or your park regulations. You
probably should raise the unit enough to get the tires
off the ground.
4. Can the Park Model be lowered to ground level?
It's not recommended to have the I-beams touching
ground, plus it would make connecting the sewer and gas line difficult.
5. Can the hitch be removed?
Yes, it's bolted on. Check with your park
manager for regulations pertaining to hitch removal.
Some parks require the hitch to remain on.
|